Task 15 - October - 2024
-----------------------------------
1. tested single channel eeg
2. tested the display interface
Updated by Remesh Kumar K R almost 2 years ago
Task 16 - October 2024
------------------------------
1. tested nextion display - GUI
2. tested BLE interface with esp32
Updated by Remesh Kumar K R almost 2 years ago
Task 17 - October 2024
---------------------------
1. fabricated the single channel eeg device in modular form
2. conference paper review
3. tested the eeg wave from with MIME
Updated by Remesh Kumar K R almost 2 years ago
Task 18 - October 2024
---------------------------
1. meeting at IITM
Updated by Remesh Kumar K R almost 2 years ago
Task 21 - October 2024
---------------------------
1. Tested CCET in esp32
2. Schematic of CCET using 555 started
3. EEG waves shaping using digital filters
Updated by Remesh Kumar K R almost 2 years ago
Task 22 - October 2024
---------------------------
1. finalized the CCET schematic.
2. components verification are done.
3. first anesthesia monitoring device's (demo) planning using modules started.
Updated by Remesh Kumar K R almost 2 years ago
Task 23 - October 2024
---------------------------
1. meeting for anesthesia monitoring device's demo.
2. idea for anesthesia monitoring device's is developed.
3. started documentation ( block diagram)
4. pcb designing of ccet started.
Updated by Remesh Kumar K R almost 2 years ago
Task 24 - October 2024
---------------------------
1. pcb design completed
2. final paper revisions are completed
3. start discussion about project plan
4. PCB design of CCET completed
4. PCB fabrication procedure started.
Updated by Remesh Kumar K R almost 2 years ago
Task 25 - October 2024
---------------------------
1. work schedule completed
2. schematic and amplifier identification for EEG monitoring
3.anesthesia monitoring demo plan and interfacing
Updated by Remesh Kumar K R almost 2 years ago
Task 28 - October 2024
---------------------------
1.work schedule finalization
2. anesthesia depth monitoring demo finalization and requirements fixation.
3. discussion on ID for ADM
4. CCET hardware (PCB) fabrication initiation.
Updated by Remesh Kumar K R almost 2 years ago
Task 29 - October 2024
-----------------------
1.ccet PCB component collection
2. finalizing PCB design
3. studies on 3 channel EEG schematic
Updated by Remesh Kumar K R almost 2 years ago
Task 30 - October 2024
---------------------------
1. conference paper
2. schematic of 3 channel eeg
3. ccet pcb fabrication
Updated by Remesh Kumar K R almost 2 years ago
Task 1 - November 2024
---------------------------
1. ccet hardware testing
2. conference paper
Updated by Remesh Kumar K R almost 2 years ago
Task 4 - November 2024
---------------------------
1. ccet hardware test and finalizing
2. redesign of ccet hardware
Updated by Remesh Kumar K R almost 2 years ago
Task 5 - November 2024
---------------------------
1. training on orcad
2. ccet new hardware schematic
Updated by Remesh Kumar K R over 1 year ago
Task 6 - November 2024
---------------------------
1. PCB design completed
2. PCB fabrication started
Updated by Remesh Kumar K R over 1 year ago
Task 8 - November 2024
---------------------------
1. PCB fabrication completed
2. component collection and population started
Updated by Remesh Kumar K R over 1 year ago
Task 11 - November 2024
---------------------------
1. hardware status meeting
2. component collection and population continue
3. single channel eeg final assembly started
Updated by Remesh Kumar K R over 1 year ago
Task 12 - November 2024
---------------------------
1. CCET board population done
2. single channel eeg final assembly continue
Updated by Remesh Kumar K R over 1 year ago
Task 13 - November 2024
---------------------------
1. ccet mechanical design started
2. single channel eeg final assembly
3. ccet firmware started
Updated by Remesh Kumar K R over 1 year ago
Task 14 - November 2024
---------------------------
1. ccet v.1.0 firmware completed
2. mechanical design completed
3. single channel eeg fabrication started
Updated by Remesh Kumar K R over 1 year ago
Task 19 - November 2024
---------------------------
1. ccet mechanical design changes incorporated and completed the mechanical design.
2. single channel eeg device firmware started.
Updated by Remesh Kumar K R over 1 year ago
Task 20 - November 2024
---------------------------
1. single channel eeg interfaced with mime software through custom usb dongle
2. connector selection for ccet
Updated by Remesh Kumar K R over 1 year ago
Task 21 - November 2024
--------------------------
1. enclosure design/modification of single channel EEG completed
2.firmware for power saving algorithm for single channel EEG started
Updated by Remesh Kumar K R over 1 year ago
Task 22 - November 2024
---------------------------
1. single channel eeg eye blink completed
2. CCET mechanical design completed
Updated by Remesh Kumar K R over 1 year ago
Task 25 - November 2024
---------------------------
1. CCET mechanical design rework
2.3 channel eeg library testing
3. documentation of projects
Updated by Remesh Kumar K R over 1 year ago
Task 26 - November 2024
---------------------------
1. CCET mechanical design rework completed
2.3 channel eeg library testing continue
Updated by Remesh Kumar K R over 1 year ago
Task 27 - November 2024
---------------------------
1. CCET pcb hardware fixing and testing
2.3 channel eeg - ADS1299 driver developing
Updated by Remesh Kumar K R over 1 year ago
Task 28 - November 2024
---------------------------
1. CCET mechanical fixing and testing
2. 3 channel eeg - ADS1299 driver developing
Updated by Remesh Kumar K R over 1 year ago
Task 29 - November 2024
---------------------------
1. 3 channel eeg design
2. CCET Bluetooth interface
Updated by Remesh Kumar K R over 1 year ago
Task 2 - December 2024
---------------------------
1.dongle firmware for EEG devices
2.3 channel eeg design using amplifier module
Updated by Remesh Kumar K R over 1 year ago
Task 3 - December 2024
---------------------------
1.dongle firmware for Single channel EEG devices
2.dongle firmware for 3 channel EEG devices using esp32 s3
Updated by Remesh Kumar K R over 1 year ago
Task 4 - December 2024
---------------------------
1.dongle firmware for 3 channel EEG devices using esp32 s3
2.3 channel EEG PCB design started
Updated by Remesh Kumar K R over 1 year ago
Task 5 - December 2024
---------------------------
1.3 channel EEG PCB design completed
2.3 channel EEG mechanical design started
Updated by Remesh Kumar K R over 1 year ago
Task 6 - December 2024
---------------------------
1.3 channel EEG PCB fabrication started
2.3 channel EEG mechanical design
3. usb - ble communication system
Updated by Remesh Kumar K R over 1 year ago
Task 9 - December 2024
---------------------------
1.3 channel EEG PCB fabrication completed
2.3 channel EEG firmware started
Updated by Remesh Kumar K R over 1 year ago
Task 10 - December 2024
---------------------------
1.3 channel EEG PCB population and board bring up activity started
Updated by Remesh Kumar K R over 1 year ago
Task 11 - December 2024
---------------------------
1. 3 channel EEG bring up activity
2. single channel EEG firmware correction
Updated by Remesh Kumar K R over 1 year ago
Task 12 - December 2024
---------------------------
1. 3 channel eeg firmware
2. single channel eeg firmware
Updated by Remesh Kumar K R over 1 year ago
Task 13 - December 2024
---------------------------
1.3 channel EEG firmware completed
2. single channel eeg receiver changed
Updated by Remesh Kumar K R over 1 year ago
Task 16 - December 2024
---------------------------
1. single channel EEG device completed
2. 3 channel EEG device sticker work and mechanical design started
Updated by Remesh Kumar K R over 1 year ago
Task 17 - December 2024
---------------------------
1. 3 channel mechanical works completed
2. CCET firmware correction done
Updated by Remesh Kumar K R over 1 year ago
Task 18 - December 2024
---------------------------
1. 3 channel EEG final assembly and testing completed
2. CCET sticker and other mechanical works are completed
Updated by Remesh Kumar K R over 1 year ago
Task 19 - December 2024
---------------------------
1. conference duty
Updated by Remesh Kumar K R over 1 year ago
Task 20 - December 2024
---------------------------
1. conference duty
Updated by Remesh Kumar K R over 1 year ago
Task 26 - December 2024
---------------------------
1. purchase list
2. electrode selection
Updated by Remesh Kumar K R over 1 year ago
Task 27 - December 2024
---------------------------
1. design analysis of eeg device
2. selection of component for eeg device
Updated by Remesh Kumar K R over 1 year ago
Task 30 - December 2024
---------------------------
1. purchase list
2. 3 channel eeg schematic
Updated by Remesh Kumar K R over 1 year ago
Task 31 - December 2024
---------------------------
1. purchase list
2. anaesthesia depth monitoring design
Updated by Remesh Kumar K R over 1 year ago
Task 1 - January 2025
---------------------------
1. anaesthesia depth monitoring design
2. CCET feature addition - firmware
Updated by Remesh Kumar K R over 1 year ago
Task 2 - January 2025
---------------------------
1. CCET feature addition - firmware
2. CCET feature addition - mechanical
2. EEG component list preparation
Updated by Remesh Kumar K R over 1 year ago
Task 3 - January 2025
---------------------------
1. ccet hardware addition
2. PR finalized
3. Spo2 BUG FIXING in firmware
Updated by Remesh Kumar K R over 1 year ago
Task 6 - January 2025
---------------------------
1. CCET Hardware finalized.
2. smart glass for blind discussion and initial study
3. studies for battery capacities in EEG devices.
Updated by Remesh Kumar K R over 1 year ago
Task 7 - January 2025
---------------------------
1. CCET firmware correction
2. smart glass for blind hardware design study
Updated by Remesh Kumar K R over 1 year ago
Task 8 - January 2025
---------------------------
1. CCET discussion with coexin
2. CCET requirement finalization
Updated by Remesh Kumar K R over 1 year ago
Task 9 - January 2025
---------------------------
1. discussion and task planning of anaesthesia depth monitoring system
2. value stabilising in heart rate monitoring
Updated by Remesh Kumar K R over 1 year ago
Task 10 - January 2025
---------------------------
1. value stabilising in heart rate monitoring is done
2. CCET microcontroller flash issue solved
Updated by Remesh Kumar K R over 1 year ago
Task 13 - January 2025
---------------------------
1. firmware architecture of anaesthesia depth monitoring system
2. software architecture of anaesthesia depth monitoring system
Updated by Remesh Kumar K R over 1 year ago
Task 15 - January 2025
---------------------------
1. hardware architecture of anaesthesia depth monitoring system
Updated by Remesh Kumar K R over 1 year ago
Task 16 - January 2025
---------------------------
1. hardware architecture of anaesthesia depth monitoring system
2. overall architecture of anaesthesia depth monitoring system
3. individual circuit and component analysis
Updated by Remesh Kumar K R over 1 year ago
Task 17 - January 2025
---------------------------
1. hardware architecture of anaesthesia depth monitoring system including eeg, ecg and spo 2
2. individual component analysis
Updated by Remesh Kumar K R over 1 year ago
Task 20 - January 2025
---------------------------
1. overall architecture of anaesthesia depth monitoring system - completed
2. individual circuit and component analysis and eeg, instrumentation and op amp are decided
Updated by Remesh Kumar K R over 1 year ago
Task 21 - January 2025
---------------------------
1. anaesthesia depth monitoring system task assignment
2. SPO2 schematic analysis
Updated by Remesh Kumar K R over 1 year ago
Task 22 - January 2025
---------------------------
1. SPO2 schematic, component, sensor finalisation.
Updated by Remesh Kumar K R over 1 year ago
Task 23 - January 2025
---------------------------
1. ECG schematic, component, sensor finalisation.
Updated by Remesh Kumar K R over 1 year ago
Task 24 - January 2025
---------------------------
1. EEG schematic, component, sensor finalisation.
2. BATTERY selection and power circuit
Updated by Remesh Kumar K R over 1 year ago
Task 27 - January 2025
---------------------------
1. CCET hard ware error identification.
2. power circuit's, component selection.
Updated by Remesh Kumar K R over 1 year ago
Task 29 - January 2025
---------------------------
1. temperature and bp circuits are done
2. component analysis.
3. medical device protection circuit.
Updated by Remesh Kumar K R over 1 year ago
Task 30 - January 2025
---------------------------
1. medical device protection circuit and implementation.
Updated by Remesh Kumar K R over 1 year ago
Task 31 - January 2025
---------------------------
1. SPO2 and temperature circuit.
Updated by Remesh Kumar K R over 1 year ago
Task 3 - February 2025
---------------------------
1. eeg and BP circuit.
2. component analysis.
Updated by Remesh Kumar K R over 1 year ago
Task 4 - February 2025
---------------------------
1. ECG circuit.
2. component analysis of ECG.
Updated by Remesh Kumar K R over 1 year ago
Task 5 - February 2025
---------------------------
1. Induction program.
Updated by Remesh Kumar K R over 1 year ago
Task 6 - February 2025
---------------------------
1. power supply circuit.
2. power supply component analysis.
Updated by Remesh Kumar K R over 1 year ago
Task 7 - February 2025
---------------------------
1. Induction program
Updated by Remesh Kumar K R over 1 year ago
Task 10 - February 2025
---------------------------
1. eeg schematic.
Updated by Remesh Kumar K R over 1 year ago
Task 11 - February 2025
---------------------------
1. anesthesia overall demo connections
2. meeting - task allotment
Updated by Remesh Kumar K R over 1 year ago
Task 12 - February 2025
---------------------------
1. SCTIMST Visit
2. redesign of 3 channel EEG device
Updated by Remesh Kumar K R over 1 year ago
Task 13 - February 2025
---------------------------
1. CCET hardware lock implementation
2. encryption of data in ccet
Updated by Remesh Kumar K R over 1 year ago
Task 14 - February 2025
---------------------------
1. encryption of data in ccet completed
2. overall anaesthesia depth monitoring design
Updated by Remesh Kumar K R over 1 year ago
Task 17 - February 2025
---------------------------
1. 3 channel eeg device modification
2. new component analysis started
Updated by Remesh Kumar K R over 1 year ago
Task 18 - February 2025
---------------------------
1. component analysis continue...
Updated by Remesh Kumar K R over 1 year ago
Task 19 - February 2025
---------------------------
1. component analysis continue.
2. AI board analysis
Updated by Remesh Kumar K R over 1 year ago
Task 20 - February 2025
---------------------------
1. component analysis continue.- modules completed
2. encryption of single channel discussion
3. EEG circuit discussion
Updated by Remesh Kumar K R over 1 year ago
Task 21 - February 2025
---------------------------
1. component analysis continue.- connectors completed, re exploration of component with new specification
2. component list
3. EEG schematic discussion
Updated by Remesh Kumar K R over 1 year ago
Task 24 - February 2025
---------------------------
1. component list finalized
2. 4 EEG schematic discussion
Updated by Remesh Kumar K R over 1 year ago
Task 25 - February 2025
---------------------------
1. 4 channel EEG schematic design
2. ccet schematic design
Updated by Remesh Kumar K R over 1 year ago
Task 27 - February 2025
---------------------------
1. wurth electronics class
2. EEG schematic verification
Updated by Remesh Kumar K R over 1 year ago
Task 3 - March 2025
---------------------------
1. meeting
2. Schematic of CCET for new version
Updated by Remesh Kumar K R over 1 year ago
Task 4 - March 2025
---------------------------
1. Schematic of CCET for new version
2. component list preparation
Updated by Remesh Kumar K R over 1 year ago
Task 5 - March 2025
---------------------------
1. component list preparation - completed
2. Schematic of CCET for new version
Updated by Remesh Kumar K R over 1 year ago
Task 6 - March 2025
---------------------------
1. Schematic of CCET for new version 60% done
2. meeting
3. eeg schematic verification
Updated by Remesh Kumar K R over 1 year ago
Task 7 - March 2025
---------------------------
1. Schematic of CCET for new version 90% done
2. CCET older version final PCB preparation for fabrication
Updated by Remesh Kumar K R over 1 year ago
Task 10 - March 2025
---------------------------
1. Schematic of CCET for new version done
2. CCET older version final PCB preparation for fabrication ad transferred to vinvish
Updated by Remesh Kumar K R over 1 year ago
Task 11 - March 2025
---------------------------
1. Schematic of CCET for new version revision and changes incorporation
2. changes for CCET pcb files according the standards of manufacturer
Updated by Remesh Kumar K R over 1 year ago
Task 12 - March 2025
---------------------------
1. Schematic transfer for display of anesthesia monitoring
2. firmware feature addition for ccet
Updated by Remesh Kumar K R over 1 year ago
Task 14 - March 2025
---------------------------
1. encryption of data transfer between ccet and software : firmware correction
Updated by Remesh Kumar K R over 1 year ago
Task 17 - March 2025
---------------------------
1. component purchase list preparation
Updated by Remesh Kumar K R over 1 year ago
Task 18 - March 2025
---------------------------
1. component purchase list preparation
2. schematic for anesthesia depth monitoring system
Updated by Remesh Kumar K R over 1 year ago
Task 19 - March 2025
---------------------------
1. schematic for anesthesia depth monitoring system
2. firmware design for display demo
Updated by Remesh Kumar K R over 1 year ago
Task 20 - March 2025
---------------------------
1. implementation of bio impedance system in anesthesia depth monitoring system.
2. firmware design for display demo continue
Updated by Remesh Kumar K R over 1 year ago
Task 21 - March 2025
---------------------------
1. firmware design for display demo continue
2. provide support for display user interface and interfacing
3. demo presentation
Updated by Remesh Kumar K R over 1 year ago
Task 24 - March 2025
---------------------------
1. implementation of bio impedance system in anesthesia depth monitoring system.
2. ccet device mechanical work
3. support for proposal writing
Updated by Remesh Kumar K R over 1 year ago
Task 25 - March 2025
---------------------------
1. ccet device mechanical work and component purchase and testing
2. support for proposal writing
Updated by Remesh Kumar K R over 1 year ago
Task 26 - March 2025
---------------------------
1. ccet device component and PCB testing
Updated by Remesh Kumar K R over 1 year ago
Task 27 - March 2025
---------------------------
1. ccet device soldering
2. ccet device PCB bring up procedure
Updated by Remesh Kumar K R over 1 year ago
Task 28 - March 2025
---------------------------
1. ccet device PCB with mechanical interface
2. ccet device parts attachment and bring up procedure started
Updated by Remesh Kumar K R over 1 year ago
Task 1 - April 2025
---------------------------
1. ccet device PCB with mechanical interface
2. ccet device parts attachment and bring up procedure continue
Updated by Remesh Kumar K R over 1 year ago
Task 2 - April 2025
---------------------------
1. ccet device rectifying sensor issues after fitting.
Updated by Remesh Kumar K R over 1 year ago
Task 3 - April 2025
---------------------------
1. CCET firmware reprograming
2. proposal meeting
3. Anastasia depth monitoring schematic check
Updated by Remesh Kumar K R over 1 year ago
Task 4 - April 2025
---------------------------
1. ccet device Hardware fixing and firmware programing
2. ccet version 2 schematic
Updated by Remesh Kumar K R over 1 year ago
Task 7 - April 2025
---------------------------
1. ccet device Hardware fixing and firmware programing
2. ccet version 2 schematic cont..
Updated by Remesh Kumar K R over 1 year ago
Task 8 - April 2025
---------------------------
1. ccet device Hardware fixing and firmware programing
2. anesthesia monitoring system schematic
Updated by Remesh Kumar K R over 1 year ago
Task 9 - April 2025
---------------------------
1. ccet device Hardware fixing and firmware programing with new controller
Updated by Remesh Kumar K R over 1 year ago
Task 11 - April 2025
---------------------------
1. ccet device Hardware fixing completed.
Updated by Remesh Kumar K R over 1 year ago
Task 15 - April 2025
---------------------------
1. ccet device Hardware discussion with coexin technologies.
2. starting recommended changes from coexin.
Updated by Remesh Kumar K R over 1 year ago
Task 16 - April 2025
---------------------------
1. ccat fixing spo2 long time usability bug.
2. ccat bug fixing
Updated by Remesh Kumar K R over 1 year ago
Task 21 - April 2025
---------------------------
1. ccat spo2 sensor change.
Updated by Remesh Kumar K R over 1 year ago
Task 22 - April 2025
---------------------------
1. ccat sensor change and bug fix completed after testing.
2. eeg emg schematic design
Updated by Remesh Kumar K R over 1 year ago
Task 23 - April 2025
---------------------------
1. eeg emg schematic design copleted.
2. display demo
Updated by Remesh Kumar K R over 1 year ago
Task 25 - April 2025
---------------------------
1. ADS1299 EEG EVALUVAION kit firmware evaluation and interfacing testing.
Updated by Remesh Kumar K R over 1 year ago
Task 28 - April 2025
---------------------------
1. ADS1299 EEG EVALUVAION kit software analysis using lab view.
2. anesthesia display demo hardware.
Updated by Remesh Kumar K R over 1 year ago
Task 29 - April 2025
---------------------------
1. anesthesia display demo firmware.
Updated by Remesh Kumar K R over 1 year ago
Task 30 - April 2025
---------------------------
1. anesthesia display firmware.
Updated by Remesh Kumar K R over 1 year ago
Task 1 - may 2025
---------------------------
1. anesthesia display firmware.
2. CCET serial number generation possibility
Updated by Remesh Kumar K R over 1 year ago
Task 2 - may 2025
---------------------------
1. CCET serial number generation possibility
2. CCET Firmware update with software
Updated by Remesh Kumar K R about 1 year ago
Task 5 - may 2025
---------------------------
1. anesthesia PCB design
Updated by Remesh Kumar K R about 1 year ago
Task 6 - may 2025
---------------------------
1. anesthesia PCB design
Updated by Remesh Kumar K R about 1 year ago
Task 7 - may 2025
---------------------------
1. anesthesia PCB design
2. wireless connectivity esp
Updated by Remesh Kumar K R about 1 year ago
Task 8 - may 2025
---------------------------
1. anesthesia PCB design completed
2. DF analysis, Corrections of PCB design
Updated by Remesh Kumar K R about 1 year ago
Task 9 - may 2025
---------------------------
1. anesthesia PCB design completed. analysis, Corrections of PCB design are done
2. firmware, sampling rate calculation and wireless connectivity with ESP.
Updated by Remesh Kumar K R about 1 year ago
Task 13 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia
Updated by Remesh Kumar K R about 1 year ago
Task 14 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - st32 controller part
Updated by Remesh Kumar K R about 1 year ago
Task 15 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - controller part
2. animal lifting - discussion
Updated by Remesh Kumar K R about 1 year ago
Task 16 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - BLE and communication part
Updated by Remesh Kumar K R about 1 year ago
Task 19 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - BLE and communication part
Updated by Remesh Kumar K R about 1 year ago
Task 20 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - power supply part (component selection)
Updated by Remesh Kumar K R about 1 year ago
Task 21 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - power supply part
Updated by Remesh Kumar K R about 1 year ago
Task 22 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - power supply part
Updated by Remesh Kumar K R about 1 year ago
Task 23 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - power supply part and AD1299 Design part.
Updated by Remesh Kumar K R about 1 year ago
Task 24 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - custom AFE board
Updated by Remesh Kumar K R about 1 year ago
Task 25 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - custom AFE board
Updated by Remesh Kumar K R about 1 year ago
Task 26 - may 2025
---------------------------
1. Designing the 4 channel eeg acquisition board for Anastasia - custom AFE board
Updated by Remesh Kumar K R about 1 year ago
Task 27 - may 2025
---------------------------
1. Designing the inter connections board for Anastasia custom board
Updated by Remesh Kumar K R about 1 year ago
Task 28 - may 2025
---------------------------
1. Designing the inter connections board for Anastasia custom board
Updated by Remesh Kumar K R about 1 year ago
Task 29 - may 2025
---------------------------
1. Designing and implementation of voltage attenuator
2. AFE Anastasia custom board component value calculations
Updated by Remesh Kumar K R about 1 year ago
Task 30 - may 2025
---------------------------
1. Design of micro voltage generator
2. AFE Anastasia custom board component value calculations and changes incorporation
Updated by Remesh Kumar K R about 1 year ago
Task 2 - june 2025
---------------------------
1. Design of micro voltage generator
2. EEG PCB design analysis
3. Anastasia component selection or controller board
Updated by Remesh Kumar K R about 1 year ago
Task 3 - june 2025
---------------------------
1. Design of EEG Simulator
2. Final PCB fixup for fabrication
Updated by Remesh Kumar K R about 1 year ago
Task 4 - june 2025
---------------------------
1. Design of EEG Simulator
2. Anesthesia controller board firmware design (stm32h723) and power calculations
Updated by Remesh Kumar K R about 1 year ago
Task 5 - june 2025
---------------------------
1. Design of EEG Simulator
2. 3 channel EEG device testing
3. final fixing of CCET
4. Anesthesia communication board firmware design
Updated by Remesh Kumar K R about 1 year ago
Task 6 - june 2025
---------------------------
1. Design of EEG Simulator
2. 3 channel EEG device testing
3. Anesthesia communication board firmware design
Updated by Remesh Kumar K R about 1 year ago
Task 9 - june 2025
---------------------------
1. Design of EEG Simulator v 2.0
2. Anesthesia communication board firmware design
Updated by Remesh Kumar K R about 1 year ago
Task 10 - june 2025
---------------------------
1. Design of EEG Simulator v 2.0
2. 8 EEG POWER SUPPLY BORD DESIGN
3 Anesthesia connection board design
Updated by Remesh Kumar K R about 1 year ago
Task 11 - june 2025
---------------------------
1. Design of EEG Simulator v 2.0 ( dac selection)
2. 8 EEG POWER SUPPLY BORD DESIGN
3 Anesthesia AFE board design
Updated by Remesh Kumar K R about 1 year ago
Task 12 - june 2025
---------------------------
1. Design of EEG Simulator v 2.0 ( filter selection)
2 Anesthesia AFE board to esp interface
Updated by Remesh Kumar K R about 1 year ago
Task 13 - june 2025
---------------------------
1. 8 channel eeg evaluation kit interfacing
2. Anesthesia documentation
Updated by Remesh Kumar K R about 1 year ago
Task 16 - june 2025
---------------------------
1. 8 channel eeg evaluation kit interfacing with esp32
2. Anesthesia documentation
Updated by Remesh Kumar K R about 1 year ago
Task 17 - june 2025
---------------------------
1. review
Updated by Remesh Kumar K R about 1 year ago
Task 18 - june 2025
---------------------------
1. schematic revision anesthesia
2. stm board firmware
Updated by Remesh Kumar K R about 1 year ago
Task 19 - june 2025
---------------------------
1. stm board firmware
Updated by Remesh Kumar K R about 1 year ago
Task 20 - june 2025
---------------------------
1. anesthesia pcb design
2. firmware ads1299
Updated by Remesh Kumar K R about 1 year ago
Task 23 - june 2025
---------------------------
1. meting with doctor
2. anesthesia pcb design
Updated by Remesh Kumar K R 12 months ago
Task 24 - june 2025
---------------------------
1. anesthesia pcb design
Updated by Remesh Kumar K R 12 months ago
Task 25 - june 2025
---------------------------
1. anesthesia pcb design
Updated by Remesh Kumar K R 12 months ago
Task 30 - june 2025
---------------------------
1. anesthesia pcb design
Updated by Remesh Kumar K R 12 months ago
Task 1 - july 2025
---------------------------
1. anesthesia pcb design
Updated by Remesh Kumar K R 12 months ago
Task 2 - july 2025
---------------------------
1. anesthesia pcb design
Updated by Remesh Kumar K R 12 months ago
Task 3 - july 2025
---------------------------
1. technical document
Updated by Remesh Kumar K R 12 months ago
Task 4 - july 2025
---------------------------
1. technical document
Updated by Remesh Kumar K R 12 months ago
Task 8 - july 2025
---------------------------
1. component arrangement
Updated by Remesh Kumar K R 12 months ago
Task 9 - july 2025
---------------------------
1. proposal wrtiting
2. firmware design
Updated by Remesh Kumar K R 12 months ago
Task 10 - july 2025
---------------------------
1. proposal writing
2. firmware design
Updated by Remesh Kumar K R 12 months ago
Task 11 - july 2025
---------------------------
1. hardware architecture - Anesthesia
2. firmware design
Updated by Remesh Kumar K R 12 months ago
Task 14 - july 2025
---------------------------
1. 2 channel hardware development
Updated by Remesh Kumar K R 12 months ago
Task 15 - july 2025
---------------------------
1. 2 channel hardware development
Updated by Remesh Kumar K R 12 months ago
Task 16 - july 2025
---------------------------
1. meeting
2. 8 channel board design
Updated by Remesh Kumar K R 12 months ago
Task 17 - july 2025
---------------------------
1. studies on animal lifting device with binu sir
2. hardware support
Updated by Remesh Kumar K R 12 months ago
Task 18 - july 2025
---------------------------
1. meeting
2. 4 channel anesthesia dsp algorithms
Updated by Remesh Kumar K R 12 months ago
Task 22 - july 2025
---------------------------
1. 4 channel anesthesia dsp algorithms
2. 4 channel board interconnection
Updated by Remesh Kumar K R 12 months ago
Task 23 - july 2025
---------------------------
1. preparation of delivery of smriti - final check up - hardware and firmware
Updated by Remesh Kumar K R 12 months ago
Task 24 - july 2025
---------------------------
1. preparation of delivery of smriti - final check up - hardware and firmware
2. packaging , meeting and KT
Updated by Remesh Kumar K R 12 months ago
Task 25 - july 2025
---------------------------
1. 8 channel, 4 channel, 2 channel PCB verification
Updated by Remesh Kumar K R 12 months ago
Task 28 - july 2025
---------------------------
1. meeting with Doctor
2. IOMT design possibilities
Updated by Remesh Kumar K R 12 months ago
Task 30 - july 2025
---------------------------
1. nextion display support
2. component asset list preparation
Updated by Remesh Kumar K R 12 months ago
Task 31 - july 2025
---------------------------
1. Asset List verification
Updated by Remesh Kumar K R 12 months ago
Task 1 - August 2025
---------------------------
1. doctor board assembly test
Updated by Remesh Kumar K R 12 months ago
Task 4 - August 2025
---------------------------
1. meeting IOMT
2. doctor population
Updated by Remesh Kumar K R 12 months ago
Task 5 - August 2025
---------------------------
1. doctor board testing
2. voltage adjustment
Updated by Remesh Kumar K R 12 months ago
Task 6 - August 2025
---------------------------
1. documentation
2. proposal
Updated by Remesh Kumar K R 12 months ago
Task 7 - August 2025
---------------------------
1. 2 channel board population
Updated by Remesh Kumar K R 12 months ago
Task 8 - August 2025
---------------------------
1. usb power supply test and communication test
Updated by Remesh Kumar K R 12 months ago
Task 11 - August 2025
---------------------------
1. meeting at nish
2.battery charging circuit test
Updated by Remesh Kumar K R 12 months ago
Task 12 - August 2025
---------------------------
1.booster circuit test and voltage adjustment
2.training to apprentices
Updated by Remesh Kumar K R 12 months ago
Task 13 - August 2025
---------------------------
1.esp32 control circuit testing
2.training to apprentices
Updated by Remesh Kumar K R 12 months ago
Task 14 - August 2025
---------------------------
1.Amplifiers section testing
2.new smriti demo development with Apprentice
Updated by Remesh Kumar K R 12 months ago
Task 18 - August 2025
---------------------------
1.2 channel firmware development
2.new smriti demo development with Apprentice cont..
Updated by Remesh Kumar K R 12 months ago
Task 19 - August 2025
---------------------------
1.2 channel overall board bring up procedure started
2.new smriti demo development with Apprentice cont.. soldering work started
Updated by Remesh Kumar K R 12 months ago
Task 20 - August 2025
---------------------------
1.2 channel overall board bring up procedure started
2.new smriti demo development with Apprentice cont.. soldering work started
3. meeting with byju sir
Updated by Remesh Kumar K R 12 months ago
Task 21 - August 2025
---------------------------
1.2 channel overall board bring up procedure
2.new smriti demo development with Apprentice cont.. soldering work , firmware modification and blood sugar ( hr and Bp Study) level project testing
3. documentation
Updated by Remesh Kumar K R 12 months ago
Task 22 - August 2025
---------------------------
1.2 channel overall board bring up procedure cont..
2.new smriti demo development with Apprentice cont.. soldering work , firmware modification and blood sugar ( hr and Bp Study) level project testing (completed 80%)
3. documentation
Updated by Remesh Kumar K R 11 months ago
Task 25 - August 2025
---------------------------
1. 2 channel board bring up - battery charging section
2. support for nextion display
3. spo2 and HR algorithm support
Updated by Remesh Kumar K R 11 months ago
Task 26 - August 2025
---------------------------
1. 2 channel board bring up - booster section
2. support for nextion display
Updated by Remesh Kumar K R 11 months ago
Task 27 - August 2025
---------------------------
1. 2 channel board bring up - analog section
2. function generator development
Updated by Remesh Kumar K R 11 months ago
Task 28 - August 2025
---------------------------
1. 2 channel board bring up - analog section
2. function generator support development
Updated by Remesh Kumar K R 11 months ago
Task 29 - August 2025
---------------------------
1. 2 channel board bring up - analog section
Updated by Remesh Kumar K R 11 months ago
Task 1 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control
Updated by Remesh Kumar K R 11 months ago
Task 2 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control continue..
Updated by Remesh Kumar K R 11 months ago
Task 3 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control continue..
2. meeting
Updated by Remesh Kumar K R 11 months ago
Task 8 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control continue..
2. SMRIHI- hardware
Updated by Remesh Kumar K R 11 months ago
Task 9 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control continue..
2. SMRIHI- hardware continue..
3. 8 channel board firmware support
Updated by Remesh Kumar K R 11 months ago
Task 10 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control continue..
2. SMRIHI- hardware continue..
3. 8 channel board firmware support continue..
Updated by Remesh Kumar K R 11 months ago
Task 11 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control continue..
2. DG visit
Updated by Remesh Kumar K R 11 months ago
Task 12 - sept 2025
---------------------------
1. 2 channel board bring up - analog section gain control continue..
2. new project polymer based electrode development
3.documentation
4. discussion with doctor
Updated by Remesh Kumar K R 11 months ago
Task 15 - sept 2025
---------------------------
1. 8 channel board bring up - firmware
2.documentation
3. meetings
Updated by Remesh Kumar K R 11 months ago
Task 16 - sept 2025
---------------------------
1. 8 channel board bring up - firmware - open BCI
2.documentation
3. meetings
Updated by Remesh Kumar K R 11 months ago
Task 17 - sept 2025
---------------------------
1. 8 channel board bring up - firmware - open BCI
2. meetings
Updated by Remesh Kumar K R 11 months ago
Task 18 - sept 2025
---------------------------
1. 8 channel board bring up - firmware - open BCI - Completed
2. meetings
Updated by Remesh Kumar K R 11 months ago
Task 19 - sept 2025
---------------------------
1. 8 channel board bring up - firmware - designed - Completed
2. meetings
Updated by Remesh Kumar K R 10 months ago
Task 22 - sept 2025
---------------------------
1. 8 channel board bring up - sampling rate bug fix - firmware
2 8 channel board bring up - interrupt based data acquisition - firmware
3. Smriti integration Support - firmware
Updated by Remesh Kumar K R 10 months ago
Task 23 - sept 2025
---------------------------
1. 8 channel board bring up - sampling rate bug fix - firmware
2 8 channel board bring up - interrupt based data acquisition - firmware
3. Smriti integration Support - firmware
4. anesthesia firmware design
Updated by Remesh Kumar K R 10 months ago
Task 24 - sept 2025
---------------------------
1. 8 channel board bring up - sampling rate bug fix - firmware
2. Smriti integration Support - firmware
3. anesthesia firmware design
4. stm32 firmware for 8 channel
5. connected health component and budget
6. meeting
Updated by Remesh Kumar K R 10 months ago
Task 25 - sept 2025
---------------------------
1. 8 channel board bring up - sampling rate bug fix - firmware
2. anesthesia firmware design
3. ESP32 firmware for 8 channel
5. TBOT component and budget
Updated by Remesh Kumar K R 10 months ago
Task 26 - sept 2025
---------------------------
1. anesthesia firmware design
2. ESP32 firmware for 8 channel
3. meeting at sct
Updated by Remesh Kumar K R 10 months ago
Task - 29 sept 2025
---------------------------
1. ESP32 firmware for 8 channel - buffer and adc data acquisition in in Arduino ide
Updated by Remesh Kumar K R 10 months ago
Task - 30 sept 2025
---------------------------
1. ESP32 firmware for 8 channel - buffer and adc data acquisition in in Arduino ide continue..
Updated by Remesh Kumar K R 10 months ago
Task - 9 oct 2025
---------------------------
1. anesthesia monitoring meeting at sct
2. software architecture - anesthesia depth monitoring
Updated by Remesh Kumar K R 10 months ago
Task - 10 oct 2025
---------------------------
1. software architecture - anesthesia depth monitoring
2.meeting connected health
3. design of connected health
Updated by Remesh Kumar K R 10 months ago
Task - 13 oct 2025
---------------------------
1. software architecture - anesthesia depth monitoring
2.design of connected health - support to Gowri
Updated by Remesh Kumar K R 10 months ago
Task - 14 oct 2025
---------------------------
1.software architecture - anesthesia depth monitoring - stm 32
2.ADC data acquisition - DMA, interrupt
Updated by Remesh Kumar K R 10 months ago
Task - 15 oct 2025
---------------------------
1.DCT - SMRITI , MEETING DESIGN
2.CBCT - meeting, KT
3.Connected health - meeting, procurement of component
Updated by Remesh Kumar K R 10 months ago
Task - 16 oct 2025
---------------------------
1.software architecture - anesthesia depth monitoring - stm 32 continue..
2.data communication - BLE
3.SMRITI - Integration
Updated by Remesh Kumar K R 10 months ago
Task - 17 oct 2025
---------------------------
1.ADS interface with stm32
2.SMRITI - hardware test
3.SMRITI - Integration
4.anesthesia hardware test - usb power
Updated by Remesh Kumar K R 10 months ago
Task - 21 oct 2025
---------------------------
1.ADS interface with stm32 continue
2.SMRITI - hardware testing
3.SMRITI - mechanical design meeting
4.connected health support
Updated by Remesh Kumar K R 9 months ago
Task - 22 oct 2025
---------------------------
1.8 channel interface with stm32 continue
2.cbct
3.anesthesia board test
Updated by Remesh Kumar K R 9 months ago
Task - 23 oct 2025
---------------------------
1.8 channel bug fix
2.anesthesia board 2 test
3.support to stm32 coding
Updated by Remesh Kumar K R 9 months ago
Task - 24 oct 2025
---------------------------
1.anesthesia board 2 test
2.support to stm32 coding
3.smriti new code integration support
Updated by Remesh Kumar K R 9 months ago
Task - 27 oct 2025
---------------------------
1.anesthesia controller board test
2.support to stm32 coding
3.cbct
Updated by Remesh Kumar K R 9 months ago
Task - 28 oct 2025
---------------------------
1.anesthesia power supply test
2.support to stm32 coding
3.8 channel analog part bug fix
Updated by Remesh Kumar K R 9 months ago
Task - 29 oct 2025
---------------------------
1.anesthesia ADS board test
2.8 channel analog part bug fix
3.stainer support
4.glucose tester support
Updated by Remesh Kumar K R 9 months ago
Task - 30 oct 2025
---------------------------
1.anesthesia communication board test
2.8 channel analog part bug fix
3.glucose tester support
Updated by Remesh Kumar K R 9 months ago
Task - 31 oct 2025
---------------------------
1.anesthesia communication board test
2.cbct
3. component identification
Updated by Remesh Kumar K R 9 months ago
Task - 3 Nov 2025
---------------------------
1.anesthesia power supply board test
2.cbct
3. component identification
Updated by Remesh Kumar K R 9 months ago
Task - 4 Nov 2025
---------------------------
1.anesthesia power supply board noise issue
2.cbct support
3. Stainer support
Updated by Remesh Kumar K R 9 months ago
Task - 6 Nov 2025
---------------------------
1.anesthesia power supply board noise issue
2.cbct support
3.glocose meter support
Updated by Remesh Kumar K R 9 months ago
Task - 7 Nov 2025
---------------------------
1.anesthesia power supply board noise issue
2.meeting
3.cbct
Updated by Remesh Kumar K R 9 months ago
Task - 10 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - regulator potion issue solved
2.meeting
3.cbct
4. eeg with stm32
Updated by Remesh Kumar K R 9 months ago
Task - 10 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - solving boost converter noise issue
2.meeting
3.cbct
4.eeg with stm32
5. smriti - spo2 - ble
Updated by Remesh Kumar K R 9 months ago
Task - 11 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - solving boost converter noise issue
2.cbct
3.eeg with stm32
4. smriti - spo2 - ble
Updated by Remesh Kumar K R 9 months ago
Task - 12 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - solving boost converter noise issue
2.cbct
3.eeg with stm32
4. smriti - spo2 - ble
Updated by Remesh Kumar K R 9 months ago
Task - 13 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - solving boost converter noise issue
2.cbct - motor drivers and stepper motor selection
3.eeg with stm32
4. smriti - spo2 wired
Updated by Remesh Kumar K R 9 months ago
Task - 14 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - solving boost converter noise issue
2.cbct - motor drivers and stepper motor selection
3.eeg with stm32
4. smriti - camera interface - rstp
5.presentation
Updated by Remesh Kumar K R 9 months ago
Task - 17 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - solving boost converter noise issue
2.cbct
3.eeg with stm32 - Arduino
4. smriti - camera interface - http - lag issue solved
Updated by Remesh Kumar K R 9 months ago
Task - 18 Nov 2025
---------------------------
1.anesthesia power supply board noise issue - solving boost converter noise issue - partially solved
2.cbct
3.eeg with stm32 - Arduino
4. esp32 communication
Updated by Remesh Kumar K R 9 months ago
Task - 19 Nov 2025
---------------------------
1.cbct
2.eeg with stm32 - Arduino
3. esp32 communication
4. SMRITI - Testing newly assembled board
Updated by Remesh Kumar K R 9 months ago
Task - 20 Nov 2025
---------------------------
1.cbct
2.eeg with stm32 - bug fix
3. SMRITI - Testing newly assembled board
Updated by Remesh Kumar K R 9 months ago
Task - 21 Nov 2025
---------------------------
1.cbct
2.eeg with stm32 - bug fix
3.SMRITI - Testing newly assembled board
4.worksheet
Updated by Remesh Kumar K R 8 months ago
Task - 24 Nov 2025
---------------------------
1.cbct
2.eeg with stm32 - bug fix
3.meeting
Updated by Remesh Kumar K R 8 months ago
Task - 25 Nov 2025
---------------------------
1.cbct - architecture
2.eeg with stm32 4 channel - bug fix
3.meeting
4. nrf
5. smriti test
Updated by Remesh Kumar K R 8 months ago
Task - 26 Nov 2025
---------------------------
1.cbct - architecture - control panel
2.eeg with stm32 4 channel - bug fix
3. nrf
4. smriti test
Updated by Remesh Kumar K R 8 months ago
Task - 27 Nov 2025
---------------------------
1.cbct - architecture - control panel - display
2.eeg with stm32 4 channel - bug fix - continue
3. smriti test
Updated by Remesh Kumar K R 8 months ago
Task - 28 Nov 2025
---------------------------
1.cbct - architecture - control panel - display
2.eeg with stm32 4 channel - bug fix - continue - compare with Arduino
3.smriti test
4.smriti Bluetooth test
Updated by Remesh Kumar K R 8 months ago
Task - 1 Dec 2025 to 3 Dec 2025
---------------------------
1.eeg with stm32 4 channel - bug fix - continue - compare with Arduino
a. analyzer the spi clocks with logic analyzer
b. found the voltage level convertor has some issue like auto direction detection affect the SPI clock
c. power issue related to ADS1299 checked. some issues detected
d. both stm32 and Arduino has same data corruption issue
2.smriti spo2 test. algorithm to detect non finger objects
3.Anesthesia depth monitoring
a. esp32 reset during BLE - issue solved
b. stm32 to esp 32 communication system
4. CBCT architecture final Design
Updated by Remesh Kumar K R 8 months ago
Task - 4 Dec 2025 to 24 Dec 2025
------------------------------------------
1.solved issue related to ADS1299-4.
a. tired with different clock and impedance of lines.
b. tried with different board
c. found problem related to clock selection
2.CONNECTED HEALTH
a. interfacing MAX sensor
b. Interfacing accelerometer
c. Interfacing Temperature sensor
d. Overall watch assembling
3. SMRITI
a. new Spo2 sensor Added
b. firmware updated
4. CBCT
a. Meetings
b. Support for pulse generation and communication in STM32
Updated by Remesh Kumar K R 7 months ago
Task - 29 Dec 2025 to 2 jan 2025
----------------------------------------
1. Driver development for ADS1299 with stm32h723
2. ADS1299 testing with dual and single power supply
3. ADS1299 signal acquisition optimization
4. Connected health mechanical design
5. Connected health Hardware integration
6. Connected firmware integration and testing
7. Connected health - Schematic
8. CBCT - meeting, discussions and support
Updated by Remesh Kumar K R 7 months ago
Task - 5 jan 2026 to 12 jan 2026
----------------------------------------
1. CBCT - meeting, discussions and support
2. Anesthesia depth monitoring discussion and presentation with nitand sct
3. Connected firmware integration and testing
4. ADS1299 signal acquisition optimization
5. smriti hardware assembly
6. ADS1299 signal noise testing
Updated by Remesh Kumar K R 6 months ago
Task - 13 jan 2026 to 30 jan 2026
----------------------------------------
1. ADS1299 signal acquisition optimization
2. smriti hardware assembly test
3. ADS1299 signal noise testing
4. CBCT - meeting, discussions and support
5. workshop
6. connected health schematic correction verification
7. Smriti new device hardware troubleshoot
8. anesthesia integration with ES32 new board assembly and test
9. anesthesia programming issue resolved
10. 8 channel schematic and component modification
11. Documentation
Updated by Remesh Kumar K R 6 months ago
Task - 2 Feb 2026 to 6 Feb 2026
----------------------------------------
1. ESP32 based EEG acquisition board bring up
2. ESP32 based EEG device power supply design
3. Connected health Samsung watch with android interface testing and support
4. preparation of documents
5. Document verification for project server
6. EEG simulation signal quality check
7. depression screening proposal work
Updated by Remesh Kumar K R 6 months ago
Task - 9 Feb 2026 to 13 Feb 2026
----------------------------------------
1. Connected health Paper draft
2. Depression Screening study and Hardware Writeup
3. HPI STUDY and hardware Write UP
4. meeting at SCT
5. NEMS write up
6. ESP32 based EEG power supply Design
7. ESP32 based EEG power supply PCB started
Updated by Remesh Kumar K R 6 months ago
Task - 17 Feb 2026 to 20 Feb 2026
----------------------------------------
1. Anesthesia new power supply PCB design completed
2. Test document for Anesthesia Completed and shared to team member to add test result
3. Road map for bio signal processing , documentation and PPT verification
4. Meeting of new project with nitha and Dr. Ramesh
5. Connected Health Document Corrected
6. 8 channel EEG device PCB design worked with gouri
7. proposal connected health started
8. 4 channel AFE modification of PCB for anesthesia completed.
Updated by Remesh Kumar K R 5 months ago
Task - 23 Feb 2026 to 27 Feb 2026
----------------------------------------
1. PCB detailed shared, Battery for medical use, component identification
2. SMRITI test for distance measurement
3. Meeting at SCG for testing the hardware
4. Initial hardware ware testing is done
5. anesthesia works are documented.
6. STM32 UART BUG fix
7. specification of devices are analyzed
8. Documentation, Component arrangement
Updated by Remesh Kumar K R 5 months ago
Task - 2 March 2026 to 7 March 2026
----------------------------------------
1. SMRITI test for distance measurement
2. Meeting at SCT for machine Analysis and CDSCO Documentation
3. STM32 UART BUG fix
4. Documentation, Component arrangement
5. AFE board configuration cnt.. initial phase was done
6. purchase list
7. power isolation circuits
8. CBCT Support
Updated by Remesh Kumar K R 5 months ago
Task - 9 March 2026 to 13 March 2026
----------------------------------------
1. AFE board configuration with command completed
2. STM32 UART BUG fix completed
3. Documentation, Component arrangement completed
4. SMRITI test for distance measurement
5. purchase list
6. anesthesia paper evaluation
7. CBCT Support
8. anesthesia hardware updating
9. 8 channel PCB design validation
Updated by Remesh Kumar K R 4 months ago
Task - 14 March 2026 to 1 April 2026
----------------------------------------
1. AFE board configuration with command issue solved with George
2. Documentation - writeup
3. SMRITI test for distance measurement and bug fix continue..
4. purchase list
5. EEG paper evaluation
6. CBCT Support
7. anesthesia hardware updating
8. 8 channel PCB design validation
9. Anesthesia desktop receiver display fabrication and completed
10. mechanical for patient side
11. meeting
12. PCCB production issues solved
13. anesthesia monitor wifi and power issue solved
Updated by Remesh Kumar K R 3 months ago
Task - 2 April 2026 to 24 April 2026
----------------------------------------
1. AFE board configuration with command issue solving
2. Documentation - writeup
3. SMRITI test for distance measurement and bug fix continue..
4. CBCT Support
5. anesthesia hardware updating
6. 8 channel PCB design validation
7. mechanical for patient side completed
8. meeting
9. Rotostainer support meeting
10.STM firmware issue solving
11. new version power supply assembling completed
12. new version power supply board bring up procedure
13. 8 channel eeg board testing
14. New version AFE board testing completed
Updated by Remesh Kumar K R 2 months ago
Task - 25 April 2026 to 31 May 2026
----------------------------------------
1. 8 Channel software development ( lead off issue is solving) - continue...
2. 8 Channel firmware development testing continue...
3. AFE board configuration with command issue solving - completed
4. Documentation - writeup
5. CBCT Support
6. anesthesia hardware updating
7. 8 channel PCB design validation
8. mechanical for patient side completed
9. meetings
10. Rotostainer support meetings
11. new version power supply board bring up procedure completed
12. 8 channel eeg board testing - completed
13. ESP based 4 channel hardware completed
14. Mechanical design follow up
Updated by Remesh Kumar K R 13 days ago
Task - 1 June 2026 to 24 july 2026
----------------------------------------
1.8 channel eeg device application development
1.1 EEG viewer application
1.2 EEG device LSL connector application
1.3 Application conversion to Linux
1.4 soldering and board bring up procedure
2. 8 channel eeg device calibrated at sct
2.1 calibrated with microvolt level ecg signal for identifying the signal pattern
2.2 calibrated with known signal such as sine, triangular and square wave in microvolt level
3. new 8 channel device design completed
3.1 added more isolation and protection to device
3.2 added patient protection
3.3 component identification and BOM completed
3.4 PCB support
4. ESP32 equivalent STM32 + stephanol I designed
5. seizure detection software algorithm transfer to raspberry pi support
6. finalizing connected health watch support
7. EEG simulator design with interns
8. 4 channel IA based board PCB and circuit design with interns
9. 4 channel with stm32(anesthesia depth monitoring )
9.1 firmware development
9.2 mechanical support
10. Roto Stainer support
10.1 development of display interface
10.2 stm32 firemware
11. jeston orin nano application development support with intern
12. proposal writing support
13. seizure analyse using stm32 support to project student
14. CBCT support
15. meeting ADM
16. meeting at SCT
17. meeting at ERTL
18. tbot circuit design