Project

General

Profile

Actions

Feature #660

closed

Feature #43: Eye blink detection algorithm in python

Feature #107: Eye blink data recording and exportation from GMCT with new montage setting (CZ-Fp)

Feature #130: Testing of eye blink cases in MATLAB

Feature #133: Function to find potential blink position in mne python

Feature #320: Find maximum Frame of all the blinks in fitBlinkLandmark function

Feature #322: Find outerStarts and outerEnds in fitBlinkLandmark function

Feature #342: Find blink velocity of the candidate signal and compute the left and right inner (0 crossing)

Feature #445: To find leftZero and rightZero index and amplitude of the candidate signal

Feature #477: Find each blink duration in the candidate signal

Feature #483: function to find average blink duration of total blinks

Feature #545: To find blink rate for eye blink detection

Feature #546: Plot the data and mark leftzero, rightZero and maxFrame in negated signal

Feature #616: Analysis of Emotiv eye blink recorded data with new protocol

Feature #649: Eye Blink analysis with average of parameters and prepare report on it

Feature #656: Finalizing folder structure, file naming convention and prepare doc on it

Prepared test report for different eye blink data for matlab and python

Added by Rashmi Sinha about 3 years ago. Updated about 3 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Rashmi Sinha
Start date:
06/22/2023
Due date:
06/26/2023
% Done:

100%

Estimated time:
Planned Due Date:
Actions #1

Updated by Rashmi Sinha about 3 years ago

  • Subject changed from Prepared test report for different eye blink data for matlab and python to Prepared test report for different eye blink data for matlab and python suggested by GH
Actions #2

Updated by Rashmi Sinha about 3 years ago

  • Subject changed from Prepared test report for different eye blink data for matlab and python suggested by GH to Prepared test report for different eye blink data for matlab and python
Actions #3

Updated by Dhanya MR about 3 years ago

  • Status changed from New to Closed
  • % Done changed from 90 to 100
Actions

Also available in: Atom PDF